Gas treatment, liquefaction, storage, regasification and refuelling - one supplier for the whole chain, with core components made in-house and every dispenser fully tested before shipment.
Endurance Energy makes the equipment that takes natural gas from a wellhead or a pipeline to the place where it is finally used. Some sites have no pipeline and never will. Others need gas at a pressure, a temperature or a purity the grid cannot give them. Our work covers the whole route: gas treatment, liquefaction, storage, regasification, refuelling and metering, plus hydrogen equipment.IT is called a complete natural gas solution.
The route has five stages. Each one answers a plain question, and each has its own equipment.

Step 1 - Gas treatment and liquefaction
Raw gas has to be cleaned before it can be cooled. Water, CO₂, mercury and heavy hydrocarbons come out in a pretreatment skid, then the gas is liquefied. Endurance owns two process packages, mixed refrigerant cycle (MRC) and high-pressure jet liquefaction, and has built plants taking 30,000 to 3,000,000 Nm³/d of feed gas.
The units are skid-mounted and modular. The same process base has been applied to pipeline gas, shale gas, wellhead gas, coalbed methane, coke-oven gas, biogas and ammonia tail gas.
Step 2 - Storage and peak-shaving
The liquid has to be held somewhere. We make vacuum-insulated cryogenic pressure vessels from 5 to 150 m³, and have the design and build capability for LNG metal tanks up to 50,000 m³, single or full containment. Loading arms, LNG pump skids and BOG recovery systems go with them. Boil-off can be recovered as high-pressure CNG or recondensed as LNG, so vapour that used to be vented becomes product instead of loss.
Step 3 - Distribution and regasification
Where no pipeline reaches, LNG travels by road tanker, railcar or ISO container and is turned back into gas at an LNG satellite station: a storage tank, vaporisers, and a pressure reduction and metering skid.
Our satellite stations start at 1,000 Nm³/h and can be expanded with more tanks and vaporisers. Regasified gas goes into local distribution, on-site power generation or industrial firing. CNG follows the same logic - a mother station compresses to 20–25 MPa and tube trailers carry it to daughter stations.
Step 4 - Road and marine refuelling
At the end of the chain, fuel goes into a vehicle or a vessel. The scope covers standard and containerised LNG refuelling stations, LNG pump skids and dispensers, L-CNG pump skids and integrated L-CNG stations that dispense LNG and CNG from one plot, CNG mother and daughter stations, hydraulic daughter-station compressors, CNG dispensers and filling posts, 40-foot mobile refuelling units, and marine LNG bunkering and fuel gas supply systems.
Step 5 - Hydrogen equipment
Hydrogen equipment rests on the same engineering base: hydrogen purification, ALK and PEM electrolysis, hydraulic-driven and diaphragm compressors, containerised refuelling packages, 35/70 MPa dispensers, filling and unloading posts, pressure regulation and metering skids, and a mobile dispenser calibration unit. Endurance built China's first hydrogen dispenser and its first hydraulic hydrogen compressor, and holds the patents on the refuelling control algorithm.
Who we serve
Four kinds of buyer sit behind these five stages: gas producers and LNG plant owners monetising a source; city gas utilities, industrial estates and power plants that need supply without a transmission pipeline; fuel retailers, bus and truck fleets and ship owners building refuelling infrastructure; and hydrogen project owners building a station or a mother station.
What they share is a site where the grid is absent, unreliable or uneconomic - Southeast Asian islands, West African CNG corridors, remote wellheads, industrial parks far from a trunk line.
What is different
Three things set the way we work apart. One supplier covers the whole chain, from process design and manufacturing through installation, commissioning and O&M, backed by equipment monitoring, smart station, project management and service platforms. Critical parts are made in-house - submerged pumps, LNG and hydrogen nozzles, breakaway couplings, mass flow meters, vacuum pump pools - so spares do not depend on a third party's lead time.
And every LNG and CNG dispenser is fully inspected on our own test rig before delivery. To date we have delivered 30-plus LNG plants and related projects, hundreds of L-CNG stations in the past decade, and 2,000 hydraulic CNG daughter-station compressors over twenty years.

FAQ
Can we buy a single stage, or does the whole chain have to be ordered together?
Single items are supplied on their own, whether a satellite station or a dispenser package . What changes is interface ownership. With one full-scope contract we carry the process interfaces; with mixed vendors the buyer needs an interface schedule in the tender, naming who sets pressures, control signals and battery limits at each tie-in.
What is the smallest feed rate you will engineer a liquefaction plant for?
Our range starts at 30,000 Nm³/d of feed gas and runs to 3,000,000 Nm³/d. Below roughly 30,000 Nm³/d the fixed cost of pretreatment and refrigeration rarely clears, and compression with a virtual pipeline is usually the better answer.
Which codes apply to an overseas station, and what about ASME or PED?
The applicable matrix is fixed at bid stage: NFPA 59A, EN 1473 or GB 50156 for the LNG facility, with pressure equipment to ASME or PED as the destination requires. We confirm certification coverage item by item against the actual product list, because a stamp held for one vessel family does not automatically cover a dispenser skid. Local fire authority review runs in parallel.











